Step by step guide: building your dream home and make it a reality
The length of time it takes from identifying a site to being handed the keys to your building has to deal with many variables. As your architect, we will set out key dates for when various stages will be reached. In a process which involves the legal system, the planning system and Building Control, revisions […]
Finding the right building site
Often this is the most difficult part of the whole process, as dreams of a perfect plot are halted by the reality of limited availability and high prices. Therefore, below are the basics of what you should do: 1. Contact estate agents local to where you wish to build. Estate Agents often will have a website […]
Things to think about ahead of renovating your home
Don’t forget about the practical things when you’re planning the renovation of your home. There is so much to consider when you are planning a refurbishment that it can be easy to focus on the aesthetics and forget about the less glamorous elements. Things like coat storage, laundry room, linen cupboards for storing towels and […]
Client Guide to Budget
Build Budget vs Project Budget A client’s budget is one of the first pieces of information requested when discussing any project. It is crucial for two reasons; firstly, the available budget is an important design parameter when looking to pull together initial feasibility options to take forward to more detailed design, but secondly it is […]
Living Design Spring Edition 2017
C3 Architects are delighted to have our recent Hall Conversion Project at Lany Road, Moira included in the Spring 2017 Edition of Living Design Magazine. The magazine includes images of the final completed project and written commentary by one of our architects Mark Cassidy. Living Design is now available in local shops …please feel free […]
Portballintrae Progress Update
Our project at Portballintrae, Co Antrim continues to progress really well and the Client hopes to be completed in September / October 2016.
Lambeg Project Update
C3 Architects are pleased to announce that building works have now been completed at the Lambeg project. Working closely with our clients, we have made a dramatic change to the existing bungalow by making alterations to the existing layout and adding an open plan living, kitchen and dining area to the rear. This open plan […]
Church of the Ascension & Church Halls at Annahilt
C3 Architects have been appointed by the Building Committee of the Church to assist them with proposed works to both the existing Church building and Church Halls Building. Our appointment will entail initial building survey, production of the initial feasibility study of proposed building works to both Buildings seperately, further development of proposals to obtain […]
New Build at Dromara
C3 Architects have recently lodged a Planning Application for a new build bungalow circa 2500 sq ft for a Private Client set in the Dromara Hills of Co. Down. Taking advantage of the site’s south facing orientation, the design incorporates open plan dining / kitchen / family spaces linked to a spacious bedroom wing and […]
Conversion of Sir William Allen Hall, Hillsborough Easter Progress Update
C3 Architects are pleased to report good progress continues to be made by Leo Matheson Contracts on the Conversion of the Sir William Allen Hall. The new zinc roof is almost completed and works are progressing to the proposed front single storey external sun terrace. Internal works continue to progress well. The removal of the […]
Site Visit to New Dwelling @ Glebe near Hillsborough
C3 recently carried out a site visit to check on progress with one of our recent designs at Glebe just outside Annahilt / Hillsborough. Working with our Client, we successfully obtained Planning Approval for a Change of House Type to that previously approved and we also tailored our design proposal to utilise some foundations already […]
Progress Update : Lany Road Hall Conversion Project
Our Lany Road, Hillsborough House Conversion project continues to progress well on site. The Insulated SIP Panels have now been installed onto the roof providing the sub structure for the new zinc roof covering. The Main Contractor Matheson Contracts LLP hope to commence the zinc cladding to the Main Roof in the coming days. Now […]
Lagan Valley Vineyard Update
We are pleased to announce that Lagan Valley Vineyard Church have now received their Formal Planning Approval from Lisburn & Castlereagh City Council. C3 Architects have lodged the Formal Building Regulation Application and works are due to commence shortly.
Conversion of Sir William Allen Update
Construction work at the Conversion of the Sir William Allen Hall between Hillsborough and Moira continues to progress well. Working together with main contractor Matheson Contracts LLP (Castlewellan) and specialist stair contractor Macspec , the project has been on site for a few months and already our client can see great progress both internally and […]
Lambeg Project Update
Our extension project in Lambeg is progressing really well. Internal plastering and floor screeds have now been completed and we await installation of the new Aluminium windows in early February. C3 architects have wide experience of extending existing dwellings. If you have a similar project please feel free to get in touch and let us […]
Warren Park Building Control Approval Received
C3 Architects are pleased to announce that Building Regulation Approval has been obtained from Lisburn & Castlereagh City Council for the Alterations & Extension Project in Warren Park, Lisburn. Works will hopefully commence in early 2016.
Woodland Project Commences On Site
C3 Architects are pleased to announce that Construction has now commenced on site at our Woodland Project in Lambeg. It is hoped works will be completed early 2016. Our clients are very excited to see how their ‘new’ home is progressing !!
Construction commences at Lany Road, Moira
C3 Architects are pleased to announce that Matheson Contracts LLP have been appointed as Main Contractor and that construction work has now commenced at our Lany Road site. The conversion of the Sir William Allen Memorial Hall into a private family residence is programmed to take 10-12 months. We will keep you updated with progress […]
PPS 21: Conversion And Reuse of Existing Buildings
Planning permission will be granted to proposals that show sympathetic conversion of the existing building, which would ultimately secure its upkeep and retention. Such proposals will be required to be of a high design quality and to meet all of the following criteria: The building is of permanent construction; The reuse or conversion would maintain […]
Planning Approval Obtained for Portballintrae Conversion
C3 Architects have successfully obtained Planning Approval from Causeway Coast & Glens Council for this exciting conversion of an existing dwelling in Portballintrae. The design provides bedroom accommodation at ground floor and provides open plan living, kitchen and dining accommodation at first floor level to take advantage of the sea views and new external deck […]
New Home for Lagan Valley Vineyard Church
C3 Architects have recently been assisting Lagan Valley Vineyard Church with their proposed move to a new home. We are currently awaiting Planning Approval which is imminent and have now also lodged the Building Regulation Application with Lisburn & Castlereagh City Council. Exciting times ahead for all involved with Lagan Valley Vineyard Church in Lisburn.
Approval for Woodland Park
Building Control Approval has now been received for the Woodland Park project. The Lany Road project is now at tender document stage and will hopefully be rendered in June with proposed start in August 2015.